当前位置:首页 > 过刊浏览->2010年第31卷第2期
HTML全文
白家疃地震台前兆仪器整合
The integration of “the ninth fiveyear plan” earthquake precursor equipments for “the tenth fiveyear plan” management system
- DOI:
- 作者:
- 燕小渝1)何案华2)马文娟3)薛娜4)赵刚2)
- 作者单位:
- 1) 中国北京 100095 白家疃地震台 2) 中国北京 100085 中国地震局地壳应力研究所3) 中国银川 750001 宁夏回族自治区地震局4) 中国天津 300201 天津市地震局
- 关键词:
- 白家疃地震台;台站整体入网;“九五”通信标准;“十五”通信规程
Baijiatuan Seismic Station, station integrating, “the ninth fiveyear plan” communication standards, “the tenth fiveyear plan” communication order
- 摘要:
- 以白家疃地震台为实验点,于2008年3月21日完成对该台“九五”前兆仪器针对“十五”台网进行整合改造。通过为期13个月的运行结果可以看出,其改造方案成本低,技术可行,产出数据可靠,为“九五”前兆台站整体接入“十五”管理系统提供了低成本、高效可靠的技术参考。
In this article, a lowlost, highly efficient and reliable technical reference was provided for the “the ninth fiveyear plan” earthquake precursor station integrating in the “the tenth fiveyear plan” management system. In March 21, 2008, we had finished the integration of the “the ninth fiveyear plan” earthquake precursor equipments for “the tenth fiveyear plan” management system in Baijiatuan earthquake station. Through the result of 13month continuous running can be seen that this program is with lowcost, technicallyfeasible and datareliable.